Thursday, July 10, 2008
Carpet is in!
It only took the carpet guys a little over two hours to install the carpet. We got the thick pad so it covers the defects in the floor. Kerry was pleased with the color. She said she was a little worried about her color choice last night before it was installed. It has been over a month since she chose it.
After the carpet was in we made a trip to Lowes. We picked up some mini blinds and some outlets and switches. I spent the rest of the afternoon putting up the other two light fixtures and installing all the outlets and light switches.
Kerry wanted to stop by Walmart and pick up a curtain for the door. She found this nice one that ties up. It is installed with a magnetic curtain rod that sticks to the door. We have carpet remnants placed at strategic places to keep the carpet new. It is funny how we used to protect the rest of the house from the third floor with remnants and now we are protecting the third floor from the outside and the rest of the house. What a knee slapper!!!
Tomorrow, Lord willing, I will put up some tile in the bathroom shower. First I am going to do the work in the circuit breaker panel to get power to the third floor. Everything is wired up there I just need to send the power to it.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment