Most of the day was spent cleaning up the mixture of lath, plaster and blown in insulation. Yesterday I was trying to put it in black trash bags but I figured out that it would take FOREVER! I decided to just push it into the next room and wait for the dumpster. I plan on making some kind of chute from the 3rd floor to the dumpster so the neighbors won't get a lot of dust covering everything. The chute will have to be about 30 feet long to make it from the window to the dumpster. I also had to pull all the little nails that stayed behind from the lath. That takes a long time. Most of the time that would be Kerry's job but she is busy with school and I couldn't wait.
Tomorrow, Lord willing, I will get most of the framing done and be able to put up some outlet boxes.