This is what the bathroom turned out like after my little remodel job. Kerry stepped through the ceiling so I had to redo the ceiling and figured while I was at it I would redo the drywall on the walls. Since the walls were open I decided to put in insulation. Since the walls were open I decided to rewire the electric since they did a terrible job when the added on. Since the walls were open I decided to replace the galvanized water supply lines with
PEX. Since the walls were open I decided to replace the galvanized drain lines with PVC. While the fixtures were out I noticed the left wall was 4 inches different from one wall to another in a 10 foot distance. I decided to rebuild the wall. I was going to tile the floor and couldn't get any wood to match the height of the
subfloor so I went ahead and replaced the whole
subfloor. But.... I was able to reuse the commode because I had just replaced it a year ago. I guess that is something.
Here is the bathroom after Kerry put the paint on the walls and I have the tile in but had to go to work before I could grout.